Die aktuellsten Einträge werden zuerst gelistet.
Skybridge over the Fraser River
Vancouver, British Columbia, Canada
Verkehrsweg unten: | Fraser River |
Vancouver, British Columbia, Canada;Owner:;British Columbia Transit Authority;Completion Date:;1988;Construction Cost:;$21,000,000;Dr. Man-Chung Tang, T.Y. Lin International/DRC Consultants Inc., was special design consultant for the narrow-deck bridge girder for this dual, direct fixation transit system. He also contributed to the development of the tower configuration and aerodynamics. This is the first precast cable-stayed bridge to use a solid deck slab without transverse floor beams.;T.Y. Lin/DRC did all construction engineering and design of the special segment lifters. The erection analysis included temporary stabilizing cables and anchors in the analytical modeling of the structure during construction. |
|